Customization: | Available |
---|---|
Type: | Switch Cabinet |
Short Circuit Withstand Current: | Standard Current |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
GCS device is suitable for power distribution system in power plant, petroleum, chemical metallurgy textile, high-rise building and other industries. it's three phase AC 50( 60) Hz low-voltage complete set of distribution device with rated operating voltage of 380V( 400V) , ( 600V) and rated current of 4000A and below and is used for power distribution of power generation and power supply central control of motor and reactive power compensation in place requiring connecting with computer and of high degree of automation, like large power plants, petrochemical system
1.Are you a trading company or a manufacturer?
We are a professional factory with 10 years of experience in the field of high and low voltage switch gear and substation. Transformers, cables, distribution boxes and various electrical equipment, such as vacuum circuit breakers, load breaking switches, etc. Our factory is an excellent supplier of the State Grid Corporation of China.
2.Do you accept custom service?
We provide OEM/ODM services, according to your drawings and parameters, our professional technical and national team can provide satisfactory solutions.
3.What is your minimum order quantity?
Our minimum order quantity is 1 piece.
4.What is your lead time?
It depends on your product requirements and quantity. It usually takes 5-15 working days.
5.How do you solve quality problems?
Please provide detailed photos of the quality problem. Our technical and quality inspection departments have done a good analysis. We'll come up with a satisfactory solution within two days.
6.What are your terms of payment?
T/T payment can negotiate the balance of deposit.Western Union, letter of credit is also acceptable.